← SPCX forward model

SPCX · Forward model · Terrestrial AI

What has to happen in Terrestrial AI

Model as of

This page changes Terrestrial AI inside the complete SPCX model. Every other vertical, corporate programme and valuation assumption stays in the selected portfolio case.

SPCX forward model
Horizon
Consolidated fair value $187.12 all other verticals held in this portfolio case
Final-quarter revenue $24.67B 41% of company revenue
Explicit segment contribution −$92.28B EBITDA less segment capex, before corporate items

Terrestrial AI

Basis quarter$2.56B
Final quarter$24.67B
Implied CAGR+57%
Final revenue mix41%

Ground-based compute leasing is the explosive line, and it is capacity-gated: revenue tracks energised megawatts times what is contracted times price. xAI/Grok and X advertising ride on top. The highest-variance vertical in the model - the contracts are real, the pricing power past the first tranche is not yet proven.

Last four quarters
2025 Q3 $850M Estimated
2025 Q4 $870M Estimated
2026 Q1 $744M Estimated
2026 Q2 $2.56B Reported
Compute infrastructure / cloud leasingX advertising and platform
Megawatts energised 1800 MW at the basis quarter 1,800 MW energised. Revenue is gated by what is switched on, not by demand — contracts land well ahead of power.
Megawatts added 400 MW/qtr changing +10.0% per quarter 400 MW a quarter, the rate implied by roughly $14B of quarterly capex at current build costs.
Utilisation 55% gliding toward 67% 55% of energised capacity is leased to third parties. The other 15 points run xAI, now carried in Model layer.
Revenue per MW $2.03M/qtr drifting −1.5% per quarter $2.03M per MW per quarter (~$8.1M a year), reconciling $2.56B of Q2 revenue against 1,800 MW at 70%.
Terrestrial AI

Latest: $24.67B (2031Q2E)

Period Value
2025Q1 $700M
2025Q2 $780M
2025Q3 $850M
2025Q4 $870M
2026Q1 $744M
2026Q2 $2.56B
2026Q3E $2.50B
2026Q4E $3.03B
2027Q1E $3.61B
2027Q2E $4.24B
2027Q3E $4.92B
2027Q4E $5.66B
2028Q1E $6.45B
2028Q2E $7.31B
2028Q3E $8.23B
2028Q4E $9.22B
2029Q1E $10.29B
2029Q2E $11.45B
2029Q3E $12.69B
2029Q4E $14.04B
2030Q1E $15.48B
2030Q2E $17.05B
2030Q3E $18.74B
2030Q4E $20.56B
2031Q1E $22.54B
2031Q2E $24.67B

Assumptions & reasoning

  • Modelled on energised capacity x utilisation x price because revenue here is supply-gated, not demand-gated. The contracts are signed well ahead of the power being available, so what is switched on sets the ceiling — a demand-side growth rate would be modelling the wrong constraint.
  • The build rate is the engine: 400 MW a quarter compounding at 10%. That is derived from roughly $14B of quarterly capex at current build costs, which is why capex intensity starts at an extreme 520% of segment revenue and decays as revenue catches up with the asset base.
  • Price is assumed to fall 1.5% a quarter. Every hyperscaler is building at once, so the pricing power visible in the first tranche of contracts is unlikely to survive multi-gigawatt supply. Holding price flat is the single most flattering change available in this model.
  • This is the highest-variance segment and the one that decides the answer: it goes from a third of revenue to over half, and its present value is deeply negative inside the horizon because the capex lands years before the cash. If the utilisation target is wrong, the valuation is wrong.
  • Orbital compute was previously carried here as unmodelled optionality. It is now its own vertical, so every megawatt in this line is on the ground.
  • Fifteen points of utilisation were moved to the Model layer vertical. 1,800 MW x 15% x $2.03M is $548M a quarter - the capacity Grok runs on. Internal inference is not a third-party lease, so billing it here and again as model revenue would count the same megawatt twice.
SPCX model map

Explore another vertical