← SPCX forward model

SPCX · Forward model · Terrestrial AI · Elon case

What has to happen in Terrestrial AI

Model as of

This page changes Terrestrial AI inside the complete SPCX model. Every other vertical, corporate programme and valuation assumption stays in the selected portfolio case.

SPCX forward model
Horizon
Consolidated fair value $882.19 all other verticals held in this portfolio case
Final-quarter revenue $79.12B 35% of company revenue
Explicit segment contribution −$107.94B EBITDA less segment capex, before corporate items

Musk's own stated targets, taken at face value and translated into per-vertical growth: Starlink 10x on V3 bandwidth, Terrestrial AI at 10 GW and $30-50 a watt, Starlink Mobile at hundreds of millions of devices, Starship at a flight a day, and orbital compute scaling toward a million satellites. Two legs have no Musk post behind them and are ours. Developer Platform is our extension of the announced Cursor purchase and the Origin launch - Origin displaces GitHub outright and agent-driven seats keep compounding, which gets the line to roughly $31B a year against Cursor's $4B run rate today. Model layer is pushed to a 60% terminal share of the pool: Grok does not just compete with Anthropic and OpenAI, it becomes the default, worth about $36B a quarter by 2031 Q2 against $0.55B today. Note what the case does NOT reach: his $100B ARR by end-2026 needs a step-change no driver here produces off a $7.81B quarter, and $1T by 2030 sits above even this case. And note what the 60% share costs to believe - it is a bigger business than every megawatt SpaceX leases to everyone else, which is the arithmetic the case has to answer.

Terrestrial AI

Basis quarter$2.56B
Final quarter$79.12B
Implied CAGR+99%
Final revenue mix35%

Ground-based compute leasing is the explosive line, and it is capacity-gated: revenue tracks energised megawatts times what is contracted times price. xAI/Grok and X advertising ride on top. The highest-variance vertical in the model - the contracts are real, the pricing power past the first tranche is not yet proven.

Last four quarters
2025 Q3 $850M Estimated
2025 Q4 $870M Estimated
2026 Q1 $744M Estimated
2026 Q2 $2.56B Reported
Compute infrastructure / cloud leasingX advertising and platform
Megawatts energised 1800 MW at the basis quarter 1,800 MW energised. Revenue is gated by what is switched on, not by demand — contracts land well ahead of power.
Megawatts added 400 MW/qtr changing +10.0% per quarter 400 MW a quarter, the rate implied by roughly $14B of quarterly capex at current build costs.
Utilisation 55% gliding toward 67% 55% of energised capacity is leased to third parties. The other 15 points run xAI, now carried in Model layer.
Revenue per MW $2.03M/qtr drifting −1.5% per quarter $2.03M per MW per quarter (~$8.1M a year), reconciling $2.56B of Q2 revenue against 1,800 MW at 70%.
Terrestrial AI

Latest: $79.12B (2031Q2E)

Period Value
2025Q1 $700M
2025Q2 $780M
2025Q3 $850M
2025Q4 $870M
2026Q1 $744M
2026Q2 $2.56B
2026Q3E $2.65B
2026Q4E $3.41B
2027Q1E $4.30B
2027Q2E $5.36B
2027Q3E $6.59B
2027Q4E $8.03B
2028Q1E $9.70B
2028Q2E $11.65B
2028Q3E $13.90B
2028Q4E $16.52B
2029Q1E $19.54B
2029Q2E $23.03B
2029Q3E $27.07B
2029Q4E $31.73B
2030Q1E $37.11B
2030Q2E $43.31B
2030Q3E $50.46B
2030Q4E $58.70B
2031Q1E $68.19B
2031Q2E $79.12B

Assumptions & reasoning

  • Modelled on energised capacity x utilisation x price because revenue here is supply-gated, not demand-gated. The contracts are signed well ahead of the power being available, so what is switched on sets the ceiling — a demand-side growth rate would be modelling the wrong constraint.
  • The build rate is the engine: 400 MW a quarter compounding at 10%. That is derived from roughly $14B of quarterly capex at current build costs, which is why capex intensity starts at an extreme 520% of segment revenue and decays as revenue catches up with the asset base.
  • Price is assumed to fall 1.5% a quarter. Every hyperscaler is building at once, so the pricing power visible in the first tranche of contracts is unlikely to survive multi-gigawatt supply. Holding price flat is the single most flattering change available in this model.
  • This is the highest-variance segment and the one that decides the answer: it goes from a third of revenue to over half, and its present value is deeply negative inside the horizon because the capex lands years before the cash. If the utilisation target is wrong, the valuation is wrong.
  • Orbital compute was previously carried here as unmodelled optionality. It is now its own vertical, so every megawatt in this line is on the ground.
  • Fifteen points of utilisation were moved to the Model layer vertical. 1,800 MW x 15% x $2.03M is $548M a quarter - the capacity Grok runs on. Internal inference is not a third-party lease, so billing it here and again as model revenue would count the same megawatt twice.
SPCX model map

Explore another vertical