← SPCX forward model

SPCX · Forward model · Space AI · Bull case

What has to happen in Space AI

Model as of

This page changes Space AI inside the complete SPCX model. Every other vertical, corporate programme and valuation assumption stays in the selected portfolio case.

SPCX forward model
Horizon
Consolidated fair value $467.81 all other verticals held in this portfolio case
Final-quarter revenue $5.23B 5% of company revenue
Explicit segment contribution −$12.56B EBITDA less segment capex, before corporate items

ARPU stabilises on enterprise mix and direct-to-cell scale, Starship reaches high cadence and low cost, AI capacity scales toward multi-GW with pricing power held. Origin converts GitHub's reliability year into migrations and takes roughly half of GitHub's book — worth about $4B a year at our estimate of its current run rate — on top of Cursor's own seat growth, reaching about $18B a year by 2031. Model layer reaches roughly 30% of the pool - Grok at frontier quality, cheaper and faster, taking a third of the market from the incumbents.

Space AI

Basis quarter$0
Final quarter$5.23B
Final revenue mix5%

Orbital data centres: compute in vacuum, cooled by radiation and powered by uninterrupted sunlight, launched on Starship at a marginal cost only SpaceX has. Pre-revenue today and the only vertical here that is pure option value - it is worth nothing at all if Starship cadence slips, and it is worth more than the rest of the model combined if it works.

Last four quarters
2025 Q3 $0 Estimated
2025 Q4 $0 Estimated
2026 Q1 $0 Estimated
2026 Q2 $0 Reported
Orbital compute capacity leasingDemonstration and government contracts
Megawatts energised 0 MW at the basis quarter Starts at zero. There is no orbital compute in service today - this line begins from nothing.
Flights 12/qtr ramping toward 91/qtr (1.0 a day) 12 Starship flights in the quarter Space AI opens — roughly one a week, across all missions.
Share of manifest 50% flights given to this line Half of STARSHIP flights. At the ceiling that is ~291 MW a quarter — 156 flights to the gigawatt.
Satellites per flight 40 160 kW each, so 6.4 MW a flight 40 compute satellites per Starship load — the V3 bay volume, not the mass limit.
Deployed per quarter 38 MW at the launch-quarter cadence 160 kW average electrical power per satellite. Thermal rejection, not solar area, is what caps this.
Utilisation 55% gliding toward 75% 55% at first light. Latency rules out most workloads, so it competes for training and batch only.
Revenue per MW $2.50M/qtr drifting −2.0% per quarter $2.5M per MW a quarter, a premium to the $2.03M ground price for free cooling and constant power.
Space AI

Latest: $5.23B (2031Q2E)

Period Value
2025Q1 $0.00
2025Q2 $0.00
2025Q3 $0.00
2025Q4 $0.00
2026Q1 $0.00
2026Q2 $0.00
2026Q3E $0.00
2026Q4E $0.00
2027Q1E $0.00
2027Q2E $0.00
2027Q3E $0.00
2027Q4E $0.00
2028Q1E $108M
2028Q2E $266M
2028Q3E $474M
2028Q4E $729M
2029Q1E $1.03B
2029Q2E $1.37B
2029Q3E $1.75B
2029Q4E $2.16B
2030Q1E $2.61B
2030Q2E $3.08B
2030Q3E $3.58B
2030Q4E $4.11B
2031Q1E $4.66B
2031Q2E $5.23B

Assumptions & reasoning

  • Deployment is derived from launch cadence, not assumed directly: flights per quarter x the share of the manifest given to compute x 40 satellites x 160 kW. At one flight a day with half the manifest, that is about 290 MW a quarter — 156 flights to the gigawatt.
  • Cadence ramps toward one flight a day and stops there. One a day with half the manifest is about 291 MW a quarter, so the base case is a claim that orbital compute settles at roughly a gigawatt every three and a half quarters — not that cadence keeps compounding. Faster or higher belongs in the bull and Elon cases.
  • This replaced a fixed 3 MW a quarter compounding at 15%, which reached only ~120 MW by 2031 — roughly a tenth of what the flight arithmetic supports. The old number was not a view about launch capability; it was a placeholder that had never been reconciled against one.
  • Utilisation stays well below the ground business. Latency rules out inference and anything interactive, so this competes for training and batch work only, and it prices at a premium to ground only while power and permitting are the binding constraint there.
  • The swing factor is cadence, and it is unproven. Every megawatt needs a launch slot, so if Starship holds at one flight a week rather than one a day this line stays a rounding error. Move the ceiling slider to see it: the assumption is doing more work here than anywhere else in the model.
  • The manifest is not a single pool. This share is of Starship flights, while the Space vertical counts external customer missions across Falcon and Starship both. Do not read the two flight numbers as competing for the same slots — but do treat a high compute share as an implicit claim that Starlink deployment has moved off Starship or become far more efficient per flight.
SPCX model map

Explore another vertical