SPCX · Forward model · Space AI · Bear case

What has to happen in Space AI

Model as of

This page changes Space AI inside the complete SPCX model. Every other vertical, corporate programme and valuation assumption stays in the selected portfolio case.

SPCX forward model
Horizon
Consolidated fair value $39.25 all other verticals held in this portfolio case
Final-quarter revenue $1.74B 6% of company revenue
Explicit segment contribution −$5.71B EBITDA less segment capex, before corporate items

ARPU pressure from emerging markets and Kuiper, AI contracts slip or utilisation lags, Starship delays keep Space loss-making and constrain constellation growth. Capex stays extreme. Origin fails to pull repositories off GitHub and Cursor seats churn back to bundled Copilot as model quality converges, leaving a $60B acquisition earning editor money — the line ends 2031 below where Cursor is running today. The Model layer never gets going: Grok holds about 6% of a pool growing 3% a quarter, which is the share the argument for this line was supposed to make irrelevant.

Space AI

Basis quarter$0
Final quarter$1.74B
Final revenue mix6%

Orbital data centres: compute in vacuum, cooled by radiation and powered by uninterrupted sunlight, launched on Starship at a marginal cost only SpaceX has. Pre-revenue today and the only vertical here that is pure option value - it is worth nothing at all if Starship cadence slips, and it is worth more than the rest of the model combined if it works.

Last four quarters
2025 Q3 $0 Estimated
2025 Q4 $0 Estimated
2026 Q1 $0 Estimated
2026 Q2 $0 Reported
Orbital compute capacity leasingDemonstration and government contracts
Megawatts energised 0 MW at the basis quarter Starts at zero. There is no orbital compute in service today - this line begins from nothing.
Flights 12/qtr ramping toward 91/qtr (1.0 a day) 12 Starship flights in the quarter Space AI opens — roughly one a week, across all missions.
Share of manifest 50% flights given to this line Half of STARSHIP flights. At the ceiling that is ~291 MW a quarter — 156 flights to the gigawatt.
Satellites per flight 40 160 kW each, so 6.4 MW a flight 40 compute satellites per Starship load — the V3 bay volume, not the mass limit.
Deployed per quarter 38 MW at the launch-quarter cadence 160 kW average electrical power per satellite. Thermal rejection, not solar area, is what caps this.
Utilisation 55% gliding toward 75% 55% at first light. Latency rules out most workloads, so it competes for training and batch only.
Revenue per MW $2.50M/qtr drifting −2.0% per quarter $2.5M per MW a quarter, a premium to the $2.03M ground price for free cooling and constant power.
Space AI

Latest: $1.74B (2031Q2E)

Period Value
2025Q1 $0.00
2025Q2 $0.00
2025Q3 $0.00
2025Q4 $0.00
2026Q1 $0.00
2026Q2 $0.00
2026Q3E $0.00
2026Q4E $0.00
2027Q1E $0.00
2027Q2E $0.00
2027Q3E $0.00
2027Q4E $0.00
2028Q1E $73M
2028Q2E $171M
2028Q3E $288M
2028Q4E $420M
2029Q1E $560M
2029Q2E $706M
2029Q3E $853M
2029Q4E $998M
2030Q1E $1.14B
2030Q2E $1.28B
2030Q3E $1.40B
2030Q4E $1.52B
2031Q1E $1.63B
2031Q2E $1.74B

Assumptions & reasoning

  • Deployment is derived from launch cadence, not assumed directly: flights per quarter x the share of the manifest given to compute x 40 satellites x 160 kW. At one flight a day with half the manifest, that is about 290 MW a quarter — 156 flights to the gigawatt.
  • Cadence ramps toward one flight a day and stops there. One a day with half the manifest is about 291 MW a quarter, so the base case is a claim that orbital compute settles at roughly a gigawatt every three and a half quarters — not that cadence keeps compounding. Faster or higher belongs in the bull and Elon cases.
  • This replaced a fixed 3 MW a quarter compounding at 15%, which reached only ~120 MW by 2031 — roughly a tenth of what the flight arithmetic supports. The old number was not a view about launch capability; it was a placeholder that had never been reconciled against one.
  • Utilisation stays well below the ground business. Latency rules out inference and anything interactive, so this competes for training and batch work only, and it prices at a premium to ground only while power and permitting are the binding constraint there.
  • The swing factor is cadence, and it is unproven. Every megawatt needs a launch slot, so if Starship holds at one flight a week rather than one a day this line stays a rounding error. Move the ceiling slider to see it: the assumption is doing more work here than anywhere else in the model.
  • The manifest is not a single pool. This share is of Starship flights, while the Space vertical counts external customer missions across Falcon and Starship both. Do not read the two flight numbers as competing for the same slots — but do treat a high compute share as an implicit claim that Starlink deployment has moved off Starship or become far more efficient per flight.