← CoreWeave, Inc.

CRWV · Forward model · Power slips case

The Power slips case, 18 quarters out

Model as of

Each segment is projected from its own operating driver, rolled up into consolidated cash flow, and discounted back to a fair value per share. The assumptions below are editable — change them and every number on this page moves with them.

CoreWeave reports a single segment and publishes no revenue split, so this model runs one vertical carrying consolidated revenue. Every actual is a reported figure; nothing is apportioned and no quarter is estimated. Managed inference (>$100M ARR) and the non-GPU services (>$400M ARR) are disclosed only as ARR points inside that same total, so neither is split out - inventing sub-lines for them would apportion reported revenue into segments the company has never published. What is ours: the utilisation reading, the price drift, the margin and capex glides, the tax rate and the exit multiple. Corporate overhead is set to zero deliberately, because adjusted EBITDA is already struck after sales, marketing and general and administrative, and charging an overhead percentage on top would double count it. Segment actuals reconcile to $5,130.9M for 2025 and to $2,078M and $2,575M for 2026 Q1 and Q2. Share count is held flat, so roughly 13% a year of dilution is charged nowhere.

CRWV forward model
Horizon
Fair value per share $20.05 −77% against $87.12
Terminal-year revenue $63.63B last four projected quarters
Enterprise value $40.59B −$61.19B explicit + $101.78B terminal

Moratoriums and grid queues push the build right without killing it. The 8 GW is still reached, just later, and the megawatts arrive after the contracts have already repriced. Revenue lands about 24% below base by 2030 at an unchanged multiple, which isolates how much of this equity is a schedule rather than a demand question.

CRWV REVENUE MODEL

Latest: $17.62B (2030Q4E)

Period Value
2024Q1 $189M
2024Q2 $395M
2024Q3 $584M
2024Q4 $747M
2025Q1 $982M
2025Q2 $1.21B
2025Q3 $1.36B
2025Q4 $1.57B
2026Q1 $2.08B
2026Q2 $2.58B
2026Q3E $3.57B
2026Q4E $4.40B
2027Q1E $5.11B
2027Q2E $5.76B
2027Q3E $6.39B
2027Q4E $7.02B
2028Q1E $7.67B
2028Q2E $8.35B
2028Q3E $9.06B
2028Q4E $9.81B
2029Q1E $10.60B
2029Q2E $11.44B
2029Q3E $12.32B
2029Q4E $13.26B
2030Q1E $14.26B
2030Q2E $15.32B
2030Q3E $16.43B
2030Q4E $17.62B
Scenarios

Where each case comes from

Bear case — primary sources

The primary sources this case is built from — filings, calls and posts. Where they are claims by an interested party rather than disclosures, every number in the Bear column is what happens if they are taken at face value.

Bull case — primary sources

The primary sources this case is built from — filings, calls and posts. Where they are claims by an interested party rather than disclosures, every number in the Bull column is what happens if they are taken at face value.

Power slips case — primary sources

The primary sources this case is built from — filings, calls and posts. Where they are claims by an interested party rather than disclosures, every number in the Power slips column is what happens if they are taken at face value.

Valuation

From cash flow to fair value

The published model, discounted at 15.0% a year with an exit multiple of 3.0x on revenue. The horizon and sliders above do not change this walk.

Present value of free cash flow, 18 quarters−$61.19B
Terminal-year revenue$63.63B
Terminal-year EBITDA$38.77B
Exit multiple, on revenue3.0x
Terminal value$190.89B
Discounted at 15.0% a year, terminal value becomes$101.78B
Share of enterprise value from the terminal251%
Enterprise value$40.59B
Net cash−$29.54B
Equity value$11.05B
Shares0.55B
Fair value per share$20.05
Against the deployed price of $87.12, as of −77%

15% on $35.1B of debt against $5.0B of equity, in an engine whose free cash flow charges no interest at all - the guided $860-940M a quarter of it has to be priced somewhere. The exit multiple prices the steady state beyond the build, not the terminal quarter: at 2030 Q4 this model still spends 68% of revenue on capex and free cash flow is negative. Once the fleet only replaces itself, 62% EBITDA less roughly 55% replacement capex is a 7% cash margin, so 3.0x revenue is already about 43x it. The shares trade near 6x forward revenue.

Read the other way round: at $87.12 the market is paying 4.1x terminal-year revenue, holding every other assumption on this page fixed. That is the number to argue about.

Quarter by quarter

The projected path

The published model's 18 quarters. The horizon and sliders above do not change this table.

Quarter CoreWeave Cloud Revenue YoY EBITDA Capex FCF R40 PV of FCF
2026 Q3E $3.57B $3.57B +161% $2.11B $9.06B −$6.95B −33 −$6.71B
2026 Q4E $4.40B $4.40B +180% $2.61B $9.85B −$7.24B +15 −$6.75B
2027 Q1E $5.11B $5.11B +146% $3.04B $10.15B −$7.11B +7 −$6.40B
2027 Q2E $5.76B $5.76B +124% $3.44B $10.20B −$6.77B +6 −$5.89B
2027 Q3E $6.39B $6.39B +79% $3.82B $10.15B −$6.33B −20 −$5.31B
2027 Q4E $7.02B $7.02B +60% $4.21B $10.06B −$5.85B −24 −$4.74B
2028 Q1E $7.67B $7.67B +50% $4.61B $9.97B −$5.37B −20 −$4.20B
2028 Q2E $8.35B $8.35B +45% $5.02B $9.91B −$4.89B −14 −$3.70B
2028 Q3E $9.06B $9.06B +42% $5.46B $9.89B −$4.43B −7 −$3.24B
2028 Q4E $9.81B $9.81B +40% $5.92B $9.91B −$3.99B −1 −$2.81B
2029 Q1E $10.60B $10.60B +38% $6.41B $9.98B −$3.57B +4 −$2.43B
2029 Q2E $11.44B $11.44B +37% $6.93B $10.10B −$3.17B +9 −$2.08B
2029 Q3E $12.32B $12.32B +36% $7.48B $10.27B −$2.79B +13 −$1.77B
2029 Q4E $13.26B $13.26B +35% $8.06B $10.49B −$2.43B +17 −$1.49B
2030 Q1E $14.26B $14.26B +35% $8.67B $10.76B −$2.09B +20 −$1.23B
2030 Q2E $15.32B $15.32B +34% $9.32B $11.08B −$1.76B +22 −$1.01B
2030 Q3E $16.43B $16.43B +33% $10.02B $11.47B −$1.45B +25 −$800M
2030 Q4E $17.62B $17.62B +33% $10.75B $11.90B −$1.15B +26 −$614M

Every row is projected. A year-over-year change is shown only where the quarter it compares against exists — an em dash means there is no comparable quarter, not a flat year.

Track record

Model revisions

Assumptions are marked to reality as each quarter prints. Every change is appended here, with the fair value the model produced at the time, so the model's own history stays visible.

DateFair value thenNote
2026-08-23 $61.24 First build, on the 2026 Q2 basis, calibrated to the raised full-year guide and the more-than-1.85 GW year-end power path given on the Q2 call.