← ORCL forward model

ORCL · Forward model · Cloud infrastructure (OCI) · Bear case

What has to happen in Cloud infrastructure (OCI)

Model as of

This page changes Cloud infrastructure (OCI) inside the complete ORCL model. Every other vertical, corporate programme and valuation assumption stays in the selected portfolio case.

ORCL forward model
Horizon
Consolidated fair value $105.37 all other verticals held in this portfolio case
Final-quarter revenue $31.75B 76% of company revenue
Explicit segment contribution −$51.61B EBITDA less segment capex, before corporate items

Recognition follows datacenter delivery, and Oracle has already told the market FY2027 gross margin steps down while sites ramp. This case runs the build a quarter or two late against a book that is 88% beyond the next twelve months, and prices the cost of getting there: about $40B a year of new debt and equity against free cash flow that was negative $23.7B in FY2026. The RPO does not disappear here — it arrives later and costs more to serve.

Cloud infrastructure (OCI)

Basis quarter$7.39B
Final quarter$31.75B
Implied CAGR+34%
Final revenue mix76%

The whole model. OCI is 30% of FY2026 revenue and effectively all of the growth: $18.1B, up 77%, with the June quarter alone up 93%. It carries GPU training and inference capacity, Oracle Database in OCI, the multicloud database running inside AWS, Azure and Google, and ordinary compute and storage. Revenue is gated by delivered datacenter capacity, not demand — Oracle reports 97.5% global GPU utilisation and says recognition follows site delivery, so the projection is a build schedule in megawatts, a utilisation rate and a price per megawatt-quarter.

Last four quarters
2026 Q2 $4.08B Reported
2026 Q3 $4.89B Reported
2026 Q4 $5.79B Reported
2027 Q1 $7.39B Reported
GPU training and inference capacityOracle Database in OCI and multicloud (AWS, Azure, Google)Autonomous DatabaseCompute, storage and networking
Megawatts energised 2850 MW at the basis quarter Live OCI megawatts at the basis quarter. Not disclosed; 850 MW was delivered in Q1 FY27 onto roughly 2 GW live.
Megawatts added 500 MW/qtr changing +5.0% per quarter 500 MW a quarter earning a full quarter. Oracle delivered 850 MW in Q1 FY27; mid-quarter handovers earn part of it.
Utilisation 98% gliding toward 98% Disclosed. Magouyrk on the Q4 FY26 call: 'Our global GPU utilization rate is 97.5%.'
Revenue per MW $2.66M/qtr drifting −0.5% per quarter Q1 FY27 OCI revenue of $7,388M over 2,850 MW at 97.5% utilisation, per megawatt-quarter.
Cloud infrastructure (OCI)

Latest: $31.75B (2032Q1E)

Period Value
2025Q1 $2.15B
2025Q2 $2.43B
2025Q3 $2.65B
2025Q4 $3.00B
2026Q1 $3.35B
2026Q2 $4.08B
2026Q3 $4.89B
2026Q4 $5.79B
2027Q1 $7.39B
2027Q2E $8.51B
2027Q3E $9.64B
2027Q4E $10.79B
2028Q1E $11.94B
2028Q2E $13.10B
2028Q3E $14.27B
2028Q4E $15.45B
2029Q1E $16.63B
2029Q2E $17.83B
2029Q3E $19.04B
2029Q4E $20.25B
2030Q1E $21.48B
2030Q2E $22.72B
2030Q3E $23.97B
2030Q4E $25.23B
2031Q1E $26.51B
2031Q2E $27.80B
2031Q3E $29.10B
2031Q4E $30.42B
2032Q1E $31.75B

Assumptions & reasoning

  • Live megawatts are the weakest input here. Oracle discloses capacity DELIVERED (more than 1.2 GW in FY26, 850 MW in Q1 FY27) but never the live earning base, so the 2,850 MW at the basis quarter is inferred and the price per megawatt falls out of it rather than being observed.
  • Delivered is not earning. Capacity handed over inside a quarter earns for only part of it, so the megawatts added in this driver run below Oracle's headline delivery figures on purpose — the engine gives a full quarter of revenue to everything it adds.
  • The implied $2.66M per megawatt-quarter is roughly 1.5x what CoreWeave's disclosure implies for a pure GPU cloud, which is the right direction: OCI also carries database, multicloud and ordinary IaaS revenue that consumes little power.
  • Capex intensity here is set on Oracle's NET cash outlay basis ($47.7B in FY26 and $18.0B in Q1 FY27 against $28.5B reported), not reported capex. Oracle itself presents the net figure as the real funding requirement, and the difference is customer prepayments and third-party manufacturer timing — the same prepayments that make the RPO convertible.
  • The $90B-or-more FY2027 guide implies OCI revenue of roughly $39B once the five other lines are grown at their observed rates — about 22% above the $32B in the September 2025 five-year schedule. Either the schedule has been quietly raised or the non-infrastructure lines must accelerate; nothing Oracle published through the Q1 FY27 release resolves which.
ORCL model map