← BE forward model

BE · Forward model · Product — Energy Servers · AI sliver case

What has to happen in Product — Energy Servers

Model as of

This page changes Product — Energy Servers inside the complete BE model. Every other vertical, corporate programme and valuation assumption stays in the selected portfolio case.

BE forward model
Horizon
Consolidated fair value $53.93 all other verticals held in this portfolio case
Final-quarter revenue $1.45B 82% of company revenue
Explicit segment contribution $6.07B EBITDA less segment capex, before corporate items

Set against the gigawatt headlines, the disclosed AI segment is about 250 MW across roughly two dozen customers — less than one quarter of shipments at the basis rate. This case holds the named frameworks flat and grows only the book Bloom has actually quantified, which is the shape the disclosure supports today rather than the shape the press releases imply.

Product — Energy Servers

Basis quarter$935M
Final quarter$1.45B
Implied CAGR+9%
Final revenue mix82%

The engine, and 88% of the basis quarter. Bloom sells solid-oxide fuel cell modules to whoever pays for the box — increasingly a financier, utility or strategic partner rather than the end user, who is buying power. What caps this line is not orders: management says every major US hyperscaler and a dozen-plus neoclouds, AI labs and colocation operators have validated the product, and that capacity is not the constraint. What caps it is how fast megawatts get built, shipped and accepted against customer site-ready dates. So the projection is a deployment schedule — quarterly deliverable megawatts, the share actually converted, and what a megawatt sells for — not a demand forecast.

Last four quarters
2025 Q3 $384M Reported
2025 Q4 $638M Estimated
2026 Q1 $653M Reported
2026 Q2 $935M Reported
Energy Server sales to end customersEnergy Server sales to financiers, utilities and channel partners
Megawatts energised 500 MW at the basis quarter 500 MW a quarter is the 2 GW annual run rate the 10-K commits to reaching at Fremont by the end of 2026.
Megawatts added 25 MW/qtr changing 0.0% per quarter 25 MW a quarter. The 10-K prices each incremental GW at $100-150M and 6-9 months to install.
Utilisation 62% gliding toward 75% Q2'26 product revenue implies 312 MW at the assumed price, 62.4% of a 500 MW quarterly nameplate.
Revenue per MW $3.00M/qtr drifting −0.5% per quarter Top of the secondary $2.5-3.0M/MW band; AEP paid $2.65B for part of a 900 MW option, implying $2.94M/MW+.
Product — Energy Servers

Latest: $1.45B (2031Q2E)

Period Value
2023Q1 $194M
2023Q2 $215M
2023Q3 $305M
2023Q4 $262M
2024Q1 $153M
2024Q2 $226M
2024Q3 $234M
2024Q4 $472M
2025Q1 $212M
2025Q2 $297M
2025Q3 $384M
2025Q4 $638M
2026Q1 $653M
2026Q2 $935M
2026Q3E $982M
2026Q4E $1.03B
2027Q1E $1.07B
2027Q2E $1.10B
2027Q3E $1.14B
2027Q4E $1.17B
2028Q1E $1.21B
2028Q2E $1.24B
2028Q3E $1.26B
2028Q4E $1.29B
2029Q1E $1.31B
2029Q2E $1.33B
2029Q3E $1.35B
2029Q4E $1.37B
2030Q1E $1.39B
2030Q2E $1.40B
2030Q3E $1.41B
2030Q4E $1.43B
2031Q1E $1.44B
2031Q2E $1.45B

Assumptions & reasoning

  • Product gross margin has run 33-37% for two years with no trend break, so margin is not what decides this line - the megawatt cadence is. Q2'26 36.50% against a 35.76% trailing-twelve-month figure.
  • Megawatt volumes here are back-solved from an assumed price, not disclosed. At $3.0M/MW the implied quarterly deployment runs 128, 213, 218 and 312 MW across the last four quarters - a coherent ramp, but arithmetic on an assumption.
  • The Oracle warrant is a contra-revenue item, not a cost. Its $324.4M aggregate fair value is 'recognized as a reduction of revenue as the underlying Energy Server systems sold under the Oracle arrangement are delivered'; $306.5M of it still sits on the balance sheet as a customer consideration asset ($91.0M current, $215.5M non-current) and will reduce reported product revenue on the Oracle 1.2 GW as it ships.
  • Bloom's own definition of product backlog 'includes both expected Bloom product revenue and reflects anticipated ITC and other tax incentives', so a per-MW figure quoted off backlog is a system value, not recognised revenue per MW. The two are different units.
  • The 5 GW figure is not current capacity. The 10-K says the Fremont building 'can accommodate additional capacity expansion of up to approximately 5 gigawatts' at 'approximately six to nine months to install and capital expenditure of approximately $100 million to $150 million' per incremental gigawatt. The committed, funded target is 2 GW by end-2026.
  • No calendar seasonality is applied. The apparent fourth-quarter concentration is dominated by large-campus delivery windows and the current capacity ramp; applying a Q4 factor would double-count those effects already carried by the megawatt driver.
BE model map

Explore another vertical